Sample output · demo data · audit-depth preview

5 kW residential hybrid — Pune

Pune, Maharashtra · IN · INR · ~420 kWh/month · tariff ₹9.5/unit

MSEDCL (MahaVitaran)Likely DISCOM from location — approved export / net-meter limit stays NOT VERIFIED until a DISCOM letter is on file.

Apples-to-apples comparison

MetricQuotation AQuotation BQuotation C
Match score74/10091/10068/100
System size5 kW5 kW5 kW
Quoted price385,000435,000410,000
Full-scope cost/kW82,00079,00086,000
FinancialGross ₹4.0L · Final ₹3.85L · Incentive not statedGross ₹4.85L · Incentive ₹50k stated on quote · Final ₹4.35LFinal ₹4.10L · Incentive not stated · Valid until not stated
Battery5.1 kWh10.2 kWh5.12 kWh
PanelWaaree · WS-540 · 540 WpAdani · ASB-HJT-575 · 575 WpMono · 550 Wp (brand only)
InverterGeneric 5 kW (model not stated)Growatt SPH 5000TL-HU (verified)On-grid 5 kW
DesignNot stated18° tilt · south · single phaseNot stated
WarrantiesP 25 / Perf 25 / Inv 5 / Bat 5 / Wrk —P 25 / Perf 30 / Inv 10 / Bat 10 / Wrk 5P 25 / Perf — / Inv 5 / Bat — / Wrk —
BOS STATUSTransport NOT_ITEMISED · Earthing NOT_ITEMISEDMounting INCLUDED · Net-meter INCLUDED · Labour INCLUDEDBattery qty UNKNOWN · Scaffolding NOT_ITEMISED
Registry / datasheetAnalyse on ProALMM ON_LIST · parse ×3 · live_webALMM NOT_FOUND
OEM mismatchesNone after verify1 CONTRADICTION (quote unchanged)
Scope coverage72%96%80%
Payback5.8 yr (calculated)4.9 yr (calculated)Not stated
Rule flags201
Not quotedTransport, earthingBattery quantity unclear
Recommended

Quotation B

Quotation B is the strongest match: roughly twice the usable battery for about ₹50,000 more, a longer battery warranty, verified TOPCon panels, and earthing / net-metering / transport inside the price. Score = Price 82×24% + Quality 90×18% + Warranty 88×15% + Backup 95×8% + ROI 86×15% + Completeness 96×12% + Transparency 92×8% → 91/100.

total = Price 82×24% + Quality 90×18% + Warranty 88×15% + Backup 95×8% + ROI 86×15% + Completeness 96×12% + Transparency 92×8% → 91/100

Quotation A: transport and earthing NOT_ITEMISED — not the same as excluded, but effective cost may be higher.

Quotation C: headline battery claims conflict with module usable total (CALCULATED) — confirm quantity before signing.

Quotation A inverter model missing — datasheet verify blocked until exact model is on the quote.

Likely DISCOM MSEDCL (Maharashtra) — approved export stays NOT VERIFIED; ask whether DISCOM / net-meter fees are inside each price.

Central CFA ₹ is never invented — Quotation B’s ₹50k incentive appears only because it was written on that PDF.

Demo only — real projects use your uploaded PDFs, Analyse on Pro (OEM + CEC/ALMM), and HTML export sections 1–20. CFA/STC amounts are never invented. Analyse your quotations